1. Project Overview
-
Location: Phu Tho, Vietnam
-
Implementation Time: November 2025
-
System Scale: 261 kWh BESS + DC Fast Charging Station + Solar Rooftop
-
Application: Supporting EV charging operations at an electric vehicle dealership
-
Implementing Partner: GG Industries Joint Stock Company
2. Project Objectives
This project was implemented with the following goals:
-
Ensure stable power supply for EV fast charging during peak demand periods
-
Reduce electricity costs by storing energy during off-peak hours and discharging during peak time
-
Increase energy independence, especially in the event of grid instability
-
Real-world operation of a Smart Grid model with an EV charging station integrated with BESS and Solar. The BESS will supply power to priority loads in the event of a grid outage

3. Key Technical Specifications
| Item | Details |
|---|---|
| Rated Energy | 261 kWh |
| Battery Type | Li-ion (LFP) 314Ah |
| PCS | 125 kW |
| Features | Bi-directional charging/discharging, smart management via EMS |
| Monitoring System | Remote monitoring via IoT platform |
| Safety Protection | Integrated BMS, fire prevention, short-circuit protection, overvoltage protection |
4. GGI’s Solution
-
The Smart Grid system is operated with BESS configured to prioritize power supply to critical loads during grid outages.
-
The distributed energy storage design is optimized and integrated with the rooftop solar PV system for enhanced operational efficiency.
-
Real-time monitoring via IoT platform, enabling dealership owners to track system performance and energy savings
-
Installation scheduled based on dealership operations, avoiding any disruption to business activities
5. Results & Benefits
-
Reduced peak load on the grid by approximately 20%
-
Lowered electricity bills by an average of 100% per month
-
Stabilized power supply for EV chargers, enhancing customer experience
-
Positioned the dealership as a modern, clean-energy-driven business