Project Introduction

Project Name:

Implementation of Two 261 kWh BESS Units at an EV Charging Station

Location:

Phu Tho Province, Vietnam

Implementation Time:

October 2025

Implementing Unit:

GG Industries

2. Project Objectives

  • Stabilize EV charging capacity during peak hours.

  • Reduce electricity costs through energy storage and off-peak utilization.

  • Improve the efficiency of renewable energy use (when integrated with a solar system).

  • Contribute to local grid load reduction and enhance operational reliability.

3. Key Technical Specifications

Item Details
System Capacity 261 kWh
Battery Type Li-ion (LFP)
PCS 125 kW
Features Bidirectional charge/discharge, intelligent control via EMS
Monitoring System Remote monitoring through IoT platform
Safety Protection Integrated BMS, fire & explosion prevention, circuit and overvoltage protection

4. Challenges & Solutions

Challenges

  • Large fluctuations in EV charging load cause significant stress on the grid.

  • Limited medium-voltage line capacity in the area.

  • Ensuring absolute safety when integrating batteries with DC fast-charging systems.

Solutions

  • Optimize the design of a distributed energy storage system.

  • Integrate an Energy Management System (EMS) for intelligent power coordination.

  • Install remote monitoring and early-warning systems for battery and system performance.

5. Achieved Results

  • Reduced station operating costs by up to 30% through off-peak power utilization.

  • Maintained 100% stable charging output during peak hours without interruption.

  • Reduced local grid load by approximately 250 kW during peak hours.

  • Contributed to promoting a greener, cleaner, and more modern image for Phu Tho City.