Installation of a 261 kWh BESS at the Cold Storage Facility of An Viet 4 Factory
C&I BESS

Installation of a 261 kWh BESS at the Cold Storage Facility of An Viet 4 Factory

1. Project Overview

Project Name: Deployment of a 261 kWh BESS at the Cold Storage Facility of An Viet 4 Factory

Location: Me Linh, Hanoi, Vietnam

Implementation Period: May 2026

Implemented by: GG Power

 

2. Project Objectives

  • Reduce electricity costs through peak shaving during peak demand periods.
  • Ensure a stable and reliable power supply for critical cold storage loads.
  • Contribute to grid load reduction and enhance overall operational reliability.

3. Key Technical Specifications

Item Details
System Capacity 261 kWh
Battery Type Li-ion (LFP)
PCS 125 kW
Features Bidirectional charging/discharging, intelligent energy management via EMS
Monitoring System Remote monitoring via IoT platform
Safety Protection Integrated BMS, fire and explosion protection, circuit interruption, overvoltage protection

4. Challenges & Solutions

  • Challenges:

    • The cold storage facility and factory operate continuously 24/7, resulting in high electricity consumption and limited flexibility to shift loads between peak and off-peak periods.

    • A stable and reliable power supply is required for critical systems, including cold storage units, production lines, preservation equipment, and operational control systems.
    • The energy storage system must meet stringent requirements for safety, stability, and continuous operation in an industrial environment.

  • Solution:

    • Optimize the design of the distributed energy storage system.
    • Integrate an Energy Management System (EMS) for intelligent power dispatch and operational control.
    • Develop customized solutions tailored to the load characteristics of each cold storage and factory model, ensuring operational efficiency and long-term electricity cost optimization.

5. Expected Outcomes

  • Reduce electricity costs through optimized operation and peak shaving.
  • Ensure stable power supply during peak hours without interruption.
  • Reduce grid load during peak demand periods.