1. Project Overview
-
Project Name: Deployment of a 100 kWh BESS integrated with a 36 kWp solar power system at an electric vehicle charging station
-
Location: Hiep Binh, Ho Chi Minh City, Vietnam
-
Implementation Period: January 2026
-
Project Implementer: GG Industries
2. Project Objectives
-
Optimize energy utilization from the rooftop solar power system.
-
Contribute to reducing grid load during peak hours.
-
Increase revenue and profitability for the EV charging station.
-
Provide a green, clean, and sustainable energy solution.
3. Key Technical Specifications
| Item | Details |
|---|---|
| System Capacity | 100 kWh |
| Battery Type | Li-ion (LFP) |
| PCS | 50 kW |
| Features | Bidirectional charge/discharge, smart management via EMS |
| Monitoring System | Remote monitoring through IoT platform |
| Safety Protection | Integrated BMS, fire & explosion protection, circuit & overvoltage protection |
4. Challenges & Solutions
Challenges:
-
Highly fluctuating EV charging loads, putting pressure on the urban power grid.
-
Complexity in seamlessly integrating the Solar PV system with the BESS.
-
Limited capacity of the local medium-voltage power distribution lines.
Solutions:
-
Deliver an end-to-end solution from Solar PV to BESS, ensuring full system synchronization.
-
Integrate an Energy Management System (EMS) for intelligent power dispatch and optimization.
-
Install remote monitoring devices with early-warning alerts for battery and system conditions.
5. Expected Outcomes
-
Reduce operating costs of the charging station by utilizing off-peak electricity.
-
Ensure stable delivery of 100% charging capacity during peak hours without interruptions.
-
Alleviate peak-hour load on the local power grid.
-