Project Introduction
-
Project Name: Deployment of Two 261 kWh BESS Units at Electric Vehicle Charging Station
-
Location: Phu Tho Province, Vietnam
-
Implementation Time: October 2025
-
Implementing Unit: GG Industries

2. Project Objectives
-
Stabilize charging capacity during peak hours at the EV charging station.
-
Reduce electricity costs by storing energy during off-peak hours and using it during peak demand.
-
Improve efficiency in utilizing renewable energy sources (if solar power is integrated).
-
Help reduce grid load in the area and enhance operational reliability.
3. Technical Specifications
| Item | Specifications |
|---|---|
| System capacity | 261 kWh |
| Battery type | Lithium-ion (LFP) |
| PCS (Power Conversion System) | 125 kW |
| Features | Bi-directional charging/discharging, smart EMS control |
| Monitoring system | Remote access via IoT platform |
| Safety protection | Integrated BMS, fireproof, short-circuit & overvoltage protection |
4. Challenges & Solutions
Challenges:
-
High and fluctuating EV charging loads put pressure on the local grid.
-
Limited capacity of medium-voltage power lines in the area.
-
Safety must be ensured when integrating battery storage with fast DC charging systems.
Solutions:
-
Optimize the design using distributed energy storage architecture.
-
Integrate an Energy Management System (EMS) for intelligent power coordination.
-
Install remote monitoring systems with early warning for battery and system status.
5. Achieved Results
-
Reduced station operating costs by up to 30% through off-peak energy usage.
-
Ensured 100% stable charging output during peak hours without interruptions.
-
Alleviated grid load by approximately 250 kW during peak demand periods.
-
Enhanced the green, clean, and modern image of Phu Tho’s urban infrastructure.