Project Overview
Project Name: Deployment of a 261 kWh BESS integrated with a rooftop solar PV system 110 kWp at the True Sound EV Charging Station.
Location: Vinh Yen, Phu Tho Province, Vietnam.
Implementation Timeline: December 2025.
Executing Unit: GG Industries.

2. Project Objectives
-
Ensure stable charging capacity at the EV station during peak hours.
-
Maximize the efficiency of rooftop solar energy utilization.
-
Reduce electricity costs by storing and using power during off-peak periods.
-
Contribute to relieving local grid load and enhancing operational reliability.
3. Key Technical Specifications
| Category | Details |
|---|---|
| System Capacity | 261 kWh |
| Loại pin | Li-ion (LFP) |
| PCS | 125 kW |
| Features | Bidirectional charging/discharging, smart EMS integration |
| Monitoring System | Remote monitoring via IoT platform |
| Safety Protection | Integrated BMS, fire prevention, circuit breaker, overvoltage protection |
4. Challenges & Solutions
5. Expected Outcomes
-
Reduce EV charging station operating costs by up to 30% by utilizing off-peak electricity.
-
Ensure 100% stable charging capacity during peak hours without disruption.
-
Relieve up to 150 kW of load on the local grid during peak demand periods.
-
Enhance the image of a green and sustainable EV charging station in Vinh Yen.