Installation of a 261 kWh BESS Integrated with a 400 kWp Solar System at an EV Charging Station in Phu Tho
C&I BESS

Installation of a 261 kWh BESS Integrated with a 400 kWp Solar System at an EV Charging Station in Phu Tho

Project Introduction

  • Project Name: Implementation of a 261 kWh Battery Energy Storage System (BESS) Integrated with a 400 kWp Solar Power System at an EV Charging Station
  • Location: Phu Tho Province, Vietnam
  • Implementation Time: October 2025
  • Implementing Unit: GG Industries

 

2. Project Objectives

  • Stabilize EV charging power during peak hours.

  • Improve energy utilization efficiency from the rooftop solar power system.

  • Reduce electricity costs by storing and consuming energy during off-peak hours.

  • Contribute to grid load reduction and enhance system reliability in the area.

3. Key Technical Specifications

Item Details
System Capacity 261 kWh
Battery Type Li-ion (LFP)
PCS 125 kW
Features Bidirectional charge/discharge, smart management via EMS
Monitoring System Remote monitoring through IoT platform
Safety Protection Integrated BMS, fire & explosion protection, circuit & overvoltage protection

4. Challenges & Solutions

Challenges:

  • Large fluctuations in EV charging loads create stress on the local power grid.

  • Maximizing the utilization of rooftop solar energy.

  • Ensuring absolute safety when integrating batteries with DC fast-charging systems.

Solutions:

  • Optimize distributed energy storage design integrated with existing solar systems.

  • Integrate an Energy Management System (EMS) for intelligent power coordination.

  • Install a remote monitoring and early warning system for battery and system health.

5. Achieved Results

  • Reduced station operating costs by up to 25% through off-peak energy usage.

  • Maintained 100% stable charging power during peak hours without interruption.

  • Reduced grid load by approximately 250 kW during peak hours.

  • Enhanced the green, clean, and modern image of Phu Tho City.